Projects

  • BADASS LABS

    THE PROJECT BADASS Labs is a 14,720 sq. ft. lab in Alameda that took approximately 7 months to complete. It’s high end labs with fume hoods and work benches sit alongside the open office area and breakroom to generate a creative and efficient flow. PROJECT DETAILS Location:Square Footage:Completed: Alameda, CA 14,720 sq. ft.April 2022

  • RIVERROCK SPEC SUITE

    THE PROJECT This spec suite was designed and built to be a modern and chic office space for a future tenant in Sunnyvale. Taking 4 months to complete, this project included upgraded lighting, high-end finishes throughout, waterfall countertops and custom woodwork throughout.  PROJECT DETAILS Location:Square Footage:Completed: Sunnyvale, CA 6,300 sq. ft.July 2021

  • IQ BIOSCIENCE

    THE PROJECT This large scale lab was built with the highest quality materials and machinery. Including fume hoods, work benches and upgraded HVAC systems this project took roughly 6 months to complete. PROJECT DETAILS Location:Square Footage:Completed: Alameda, CA 14,300 sq. ft.April 2022

  • MATILDA COMMON AREAS

    THE PROJECT These upgraded common areas spanned between 2 buildings and took about 6 months to complete. The common areas include a fully remodeled gym, gym classroom, locker rooms including showers and completely updated restrooms with high-end finishes. PROJECT DETAILS Location:Square Footage:Completed: Sunnyvale, CA 8,220 sq. ft.August, 2022

  • NEW TENANT IN SUNNYVALE

    THE PROJECT This tenant improvement took place in Sunnyvale, CA and covered half of the 6th floor in the building. The project took approximately 4 months to complete. The scope included HVAC, new floor layout, angled walls, electrical including new lighting, fire sprinklers and new finishes including carpet, polished concrete and paint. PROJECT DETAILS Location:Square Footage:Completed:…

  • PLEASANTON OFFICE REMODEL

    THE PROJECT This commercial office remodel is located in Pleasanton and took approximately 2 months to complete. The project was around 2,000 square feet and the scope included demo, acoustical ceiling renovations, installing lighting fixtures, millwork, door installation as well as new paint and flooring throughout the space. PROJECT DETAILS Location:Square Footage:Completed: Pleasanton, CA 945882,000…

  • LIVERMORE OFFICE REMODEL

    THE PROJECT Complete office remodel took place in Livermore and was 14,000 square feet. The project took place on the main floor and on the mezzanine and took 6 months to complete. The scope of the project included demo, pouring concrete, framing, electrical work, HVAC, fire sprinkler installation and finishes that included paint, carpet and…

  • TENANT IMPROVEMENT IN NEWARK

    THE PROJECT This 13,200 sq. ft. tenant improvement was in Newark and took roughly 7 months to complete. The project had high end finishes including living wall elements throughout the space. The scope of the project included demo, millwork, framing, doors, glazing, tile, ceilings, flooring, StickWood wall covering, paint, fire sprinklers, HVAC and electrical work….

  • SAN JOSE CONFERENCE CENTER REMODEL

    THE PROJECT This conference center was completely remodeled to include modern designs and took five months to complete. This project was in San Jose and was finalized in January of 2017. The scope included structural steel work, fire safety, window coverings, electrical, plumbing, framing/drywall and finishes that included tile, carpet, wallcoverings and paint. PROJECT DETAILS…

  • TENANT IMPROVEMENT IN WALNUT CREEK

    THE PROJECT This 8,200 sq. ft. tenant improvement in Walnut Creek, CA took roughly 5 months to complete. Scope of work for the project included demo, fire sprinklers, life safety, glazing, upgraded plumbing fixtures, new lighting, cabinetry and elaborate wall details and ceiling clouds throughout the space. PROJECT DETAILS Location:Square Footage:Completed: Walnut Creek, CA 945968,200…