THE PROJECT
This conference center was completely remodeled to include modern designs and took five months to complete. This project was in San Jose and was finalized in January of 2017. The scope included structural steel work, fire safety, window coverings, electrical, plumbing, framing/drywall and finishes that included tile, carpet, wallcoverings and paint.
PROJECT DETAILS
Location:
Square Footage:
Completed:
San Jose, CA
6,340 sq. ft.
January, 2017